The low-bid contractor sought out Icon Equipment to assist them with their support of excavation for a remedial action plan. An Icon Rep met with the contractor on site to review site plans and discuss shoring options for this particular area of concern. There were several existing buildings and underground utilities near the excavation that could not be damaged or relocated so Icon recommended the contractor use a 42’L x 20.50’W x 20’H Environmental System that allowed them to maneuver the system in a manner as to not damage the existing buildings or utilities. The contractor anticipated this work being completed in (1) month, but with Icon’s Environmental System, he was able to complete the project in (2) weeks!