An environmental company and loyal customer contacted Icon Equipment in reference to a former service station where remedial excavation was required. They had several areas of concern including the existing structure, the road, and overhead utilities. Icon proposed using a 1-Bay Slide Rail Environmental Pit, 13.12’L x 13.12’W x 16’ deep. Our four-sided corner rails allowed ease of moving the system around the site, mitigating cross contamination, and protecting the road and structure from undermining. Once again, turning to ICON solved their problems.